Storage (Duration 1h)

132 unique locations (633 components) - Page 1 of 6

Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)
• 2026 kW CHP unit
• A Battery Energy Storage System
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
11.16 MW
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (3 components)
• 29MW of DSR
• A new Build Generating Storage CMU
Inactive • 2023-24 (T-4), 2020-21 (T-1)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
10.04 MW
Thurscoe Business Park, Barrowfield Rd, Thurscoe, Rotherham S63 0DB (4 components)
• 5MW of Lithium Ion battery storage and power conversion systems.
• Gas reciprocating engines
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
0.67 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (8 components)
• 1.200MW Battery Energy Storage System
• A Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• CMU Component is 500kVA reciprocating diesel engine.
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (10 components)
• 2MW BESS
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sub station Percival Lane Runcorn Cheshire WA7 4DS (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (3 components)

Storage facility

Inactive • 2022-23 (T-1)
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (5 components)
• Aux. load separately metered
• Storage facility
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (4 components)
• 9.999 MW Battery Storage unit located at Dunblane.
• A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. The battery system will be completely independent in terms of operation, metering, ownership etc to the Biomass Station.
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (2 components)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Inactive • 2023-24 (T-1)
2.23 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Inactive • 2023-24 (T-1)
1.12 MW
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)
• CMU consisting of a gas reciprocating engine and alternator
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (1 component)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Inactive • 2022-23 (T-4)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Inactive • 2022-23 (T-3), 2022-23 (T-1) ...
Roundswell Business Park, Barnstable, Devon EX31 3TD (3 components)

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
1.79 MW
Rigby Landfill Site, Chorley Road, Standish, Wigan, WN1 2XL (2 components)
• A 2.5MW New Build Battery Storage System
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2022-23 (T-3)