Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

94 unique locations (304 components) - Page 1 of 4

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components) Geocoding Needed

10MW battery energy storage facility at Upton Lane, Rownhams

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
16.41 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components) Geocoding Needed

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Storage Storage (Duration 1h) Reliagen Electric Ltd New Build Generating CMU Staines Battery Storage Facility Staines Battery Storage Facility Conditional TW18
Inactive • 2022-23 (T-4), 2021-22 (T-4)
23.60 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component) Geocoding Needed

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Inactive • 2023-24 (T-1)
3.35 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components) Geocoding Needed
• A 50MW New Build Battery Storage site
• Existing 50MW Battery Storage site
Storage (Duration 1h) HC ESS6 LIMITED New Build Generating CMU Wickham Market 3 Wickham Market 3 +1 more IP13
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.71 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (1 component)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Not Prequalified SL9
Inactive • 2021-22 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components) Geocoding Needed

2MW BESS

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU KPB001 KPB001 PL6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1.94 MW
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
26.10 MW
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component) Geocoding Needed

Storage facility

Storage (Duration 1h) IRE 001 Limited New Build Generating CMU Ernesettle Lane PL5
Inactive • 2022-23 (T-1)
5.17 MW
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components) Geocoding Needed

Storage facility

Storage Storage (Duration 1h) IRE 001 LIMITED New Build Generating CMU KEYDT1 2MW storage KEYDT2 18MW storage +1 more PL2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
9.32 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components) Geocoding Needed

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …

Storage Storage (Duration 1h) E.ON UK CHP LIMITED New Build Generating CMU Stevens Croft Battery Stevens Croft Battery Conditional DG11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
4.73 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Inactive • 2023-24 (T-1)
1.12 MW
Spitfire Way, Wholeflats, Grangemouth FK3 9UB, Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (4 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Roundswell Business Park, Barnstable, Devon EX31 3TD (1 component) Geocoding Needed

Front of the Meter battery storage asset located in Devon.

Inactive • 2023-24 (T-1)
0.60 MW
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components) Geocoding Needed
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Storage (Duration 1h) HC ESS4 LIMITED New Build Generating CMU Longridge 3 Longridge 3 +1 more PR2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
32.80 MW
Potmans Lane, Battle, TN33 9BL (6 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) BRK 002 Limited New Build Generating CMU Potmans Lane A Potmans Lane B +1 more Not Prequalified TN33
Inactive • 2023-24 (T-4), 2022-23 (T-3)
10.24 MW
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components) Geocoding Needed

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more BS10
Inactive • 2023-24 (T-4), 2022-23 (T-4)
11.59 MW
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components) Geocoding Needed
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
• A Battery Energy Storage System
Storage (Duration 1h) ARL 016 LIMITED New Build Generating CMU Eynsford Close Conditional BR5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Perseverance Road, Hereford, UK, HR4 9SE (1 component) Geocoding Needed

A 8MW New Build Battery Storage Site

Storage (Duration 1h) Noriker Perseverance Ltd New Build Generating CMU Noriker Perseverance 1 Conditional HR4
Inactive • 2022-23 (T-4)
2.35 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components) Geocoding Needed

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.75 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components) Geocoding Needed
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited New Build Generating CMU Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.78 MW
Nunhide Lane, Theale, Berkshire, RG31 7SD (3 components) Geocoding Needed

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
32.00 MW
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components) Geocoding Needed
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Halesworth Battery Storage Facility Halesworth Battery Storage Facility +1 more Conditional IP19
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
35.66 MW
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components) Geocoding Needed
• A 20MW New Build Battery Storage Site
• A 40MW New Build Battery Storage Site
Storage (Duration 1h) HC ESS8 Limited New Build Generating CMU Immingham 1 Immingham 2 Conditional DN41
Inactive • 2022-23 (T-4)
17.64 MW
Loading map...
Showing 25 locations