Storage (Duration 1h)
234 unique locations (1745 components) - Page 1 of 10
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (58 components)
Yalberton Road, Paignton, TQ4 7QL (1 component)
New Build CMU comprising of battery storage and associated plant
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (7 components)
Battery Storage
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (7 components)
Battery Storage
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)
New build one-hour duration storage to replace diesel plant
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)
Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …
Welkin Road, Bredbury, SK6 2BH (4 components)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (18 components)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (10 components)
10MW battery energy storage facility at Upton Lane, Rownhams
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (25 components)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (7 components)
BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.
Traston Road, Newport, NP19 4PW (1 component)
A 18MW distribution connected energy storage plant comprising of batteries
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)
New build one-hour duration storage to replace diesel plant
TIR John North Road, St Thomas, Swansea, SA1 7BG (1 component)
New build one-hour duration storage to replace diesel plant
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (5 components)
1.200MW BESS
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (13 components)
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
The Manorway, Stanford-leHope, SS17 9LL (2 components)
A Battery Energy Storage System
The Common, Malmesbury, Wiltshire, SN16 9RJ (11 components)
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (6 components)
A new battery storage plant, with associated civil works, switchgear and electrical connection.
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)
2MW BESS
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (13 components)
Sub station Percival Lane Runcorn Cheshire WA7 4DS (8 components)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.