Storage (Duration 1h)

234 unique locations (1745 components) - Page 1 of 10

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (58 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
2.99 MW
Windsor Battery East, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (7 components)

Battery Storage

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.09 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (11 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
11.16 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …

Active • 2025-26 (T-1), 2023-24 (T-1)
29.38 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (18 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
66.68 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (10 components)

10MW battery energy storage facility at Upton Lane, Rownhams

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (25 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.89 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (3 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (7 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.

Active • 2025-26 (T-1), 2024-25 (T-1) ...
41.63 MW
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
3.59 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (3 components)

New build one-hour duration storage to replace diesel plant

Inactive • 2023-24 (T-1)
10.04 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4)
3.59 MW
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ (5 components)

1.200MW BESS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.03 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (13 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (10 components)
• A 50MW New Build Battery Storage site
• Existing 50MW Battery Storage site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
5.49 MW
The Common, Malmesbury, Wiltshire, SN16 9RJ (11 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (6 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-4), 2021-22 (T-1)
14.00 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (9 components)

2MW BESS

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (13 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.88 MW
Sub station Percival Lane Runcorn Cheshire WA7 4DS (8 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations