Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

141 unique locations (1208 components) - Page 6 of 6

BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Active • 2028-29 (T-4)
1.05 MW
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (14 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.35 MW
Boscar Grange Farm York YO61 3NQ (11 components)

Battery Energy Storage system operating alongside solar farm

Active • 2025-26 (T-1), 2024-25 (T-4) ...
19.91 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4)
0.11 MW
Bilton Farm, Preston Road, Hull, HU11 4DZ (18 components)
• Battery Energy storage linked to solar farm
• Solar farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.34 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Active • 2025-26 (T-4)
Basing Road, Basingstoke, RG24 7AN (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2023-24 (T-1)
13.99 MW
Barton Hill Way, Torquay, TQ2 8JG (9 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.28 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (4 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Active • 2024-25 (T-1), 2023-24 (T-1)
11.64 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (13 components)
• Battery storage plant
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.58 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (17 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
55.97 MW
60-70 Reach Road Burwell CB25 0AH (5 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
29.34 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (9 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW
Loading map...
Showing 16 locations