Storage (Duration 1h)

334 unique locations (1426 components) - Page 12 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (8 components) Geocoding Needed
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.12 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Inactive • 2021-22 (T-1)
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Bridgend Rejected CF31
Active • 2025-26 (T-4)
2.10 MW
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU Cleveland TS13
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
113.67 MW
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Storage (Duration 1h) ENEL X UK LIMITED Existing Generating CMU MK45
Inactive • 2021-22 (T-4)
7.60 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.09 MW
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 008 Limited New Build Generating CMU Conditional SP4
Inactive • 2022-23 (T-4)
14.41 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified DT4
Inactive • 2023-24 (T-4)
10.20 MW
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component)

28MW/28MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU CEDAR COTTAGES Not Prequalified RM14
Active • 2026-27 (T-4)
3.31 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Storage Storage (Duration 1h) GHEB2 C3 Limited CONRAD (SWINDON) LIMITED New Build Generating CMU Catsbrain Farm Catsbrain Farm +3 more SN3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
26.94 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage (Duration 1h) Shaw-Energi Ltd New Build Generating CMU Carnegie Road Phase II Not Prequalified L13
Active • 2024-25 (T-4)
12.39 MW
Carlton, Stockton-on-Tees, TS21 1EA (8 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.20 MW
Capenhurst Lane, Cheshire, CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
19.92 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
33.77 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
0.58 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
10.04 MW
Brotherton Weir, Knottingley, West Yorkshire, WF11 8HR (7 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.48 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (7 components)
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Battery Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (1B) +1 more BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.22 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2028-29 (T-4)
1.05 MW
Loading map...