Storage (Duration 1h)

30 unique locations (355 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (11 components)
• 20.000 MW of battery storage located at Macclesfield.
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• ... and 1 more unique description
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Unproven DSR CMU Hulley Road SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4.67 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (6 components)

Front of the Meter battery storage asset located in Devon.

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.17 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.71 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS2 AGABS3 +2 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (12 components)
• 20.000 MW of battery storage located at Lascar Works
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +4 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500 MW of battery storage located at Hereford.
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (14 components)
• 15.310 MW installed capacity Battery Storage facility
• 17.315 MW installed capacity Battery Storage facility
• 17.615 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
9.02 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (9 components)
• Battery Project on Greenfield Site
• Battery Project on greenfield site
• Battery Storage site at greenfield project.
• ... and 2 more unique descriptions
Active • 2029-30 (T-4), 2028-29 (T-4) ...
119.78 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.32 MW
Land North of Clayhill Farm Westoning, MK45 5JD (18 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• 6 MW Battery Storage facility located at Westoning.
• ... and 4 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (3 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active • 2028-29 (T-4), 2026-27 (T-1) ...
2.83 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components)

CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.77 MW
Land Adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (12 components)
• New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.85 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• 5.4 MW of battery storage units across different sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS2 AGABS3 +3 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Heywood Grange,Dilhorne,Staffordshire,ST10 2PL
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 AGABS4 +2 more ST10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (5 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more NN7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
31.19 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
DSR Battery Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ABS1 ABS2 +4 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Drayton Manor Farm, Alcester Road, Stratford-upon-Avon, CV37 9RG (10 components)
• 0.400MW of battery storage located at Stratford-Upon-Avon.
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• 1 x 1MW / 1.2 MWh BYD Lithium Ion Battery: at Drayton Manor Farm,Alcester Road,Stratford-upon-Avon,CV37 9RG
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Dairy Lane, Westhamnett, Chichester, PO20 2BG (8 components)

4MW battery co-located with a solar farm

Storage (Duration 1h) E.ON UK PLC NPCM-13 NPCM-13 +4 more PO20
Active • 2029-30 (T-4), 2028-29 (T-4) ...
1.53 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
Loading map...
Showing 25 locations