Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

143 unique locations (576 components) - Page 1 of 6

Active MW: 0.00 MW
Inactive MW: 0.00 MW
24A Flightway, Dunkeswell, Honiton, EX14 4LG (10 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of a battery storage asset
Active • 2024-25 (T-4), 2023-24 (T-4) ...
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 3h) Storage (Duration 4h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified MK15
Active • 2027-28 (T-4), 2024-25 (T-1)
0.13 MW
Benton Green Lane, Berkswell, Coventry, West Midlands, CV7 7DB (1 component)

New Build Battery Storage Facility

Active • 2029-30
30.77 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.22 MW
21.94 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 4h) CSE33 Limited New Build Generating CMU Bramford33 Rejected IP8
Active • 2027-28 (T-4)
122.81 MW
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (1 component)

New Build Battery Storage

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED GR - Buxton Road Not Prequalified SK17
Active • 2028-29 (T-4)
7.51 MW
Campingholm Farm, Gretna Green, DG16 5HR (5 components)

The CMU Component is a New Build Generating battery storage site.

Active • 2029-30
80.45 MW
Capenhurst Lane, Capenhurst, Chester, Chesire, CH66 2GU (1 component)

The CMU is a standalone, 49.5 MW Lithium ion battery storage facility located to the south of Capenhurst Lane, CH66 2GU. The site will include an onsite 132kV substation, battery …

Active • 2029-30
21.76 MW
Cirencester Solar Farm, Witpit Lane, Preston, Cirencester, GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (4 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Storage (Duration 4h) CIRENCESTER SOLAR FARM LTD Cirencester Solar Farm Cirencester Solar Farm GL7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.69 MW
Coal Aston, Dronfield, S18 3AA (2 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dyche Lane Dyche Lane 2 Not Prequalified S18
Active • 2028-29 (T-4)
28.21 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available., Please see the cover letter for more details. (5 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4), 2024-25 (T-1)
39.67 MW
Cooksons Green Farm, East Howle, Ferryhill, DH6 5LJ (1 component)

A BESS built in a Greener Grid Park.

Active • 2029-30
101.11 MW
Dellows, Stocking Pelham, Hertfordshire, SG9 0JA (1 component)

New Build Battery Storage Facility

Active • 2029-30
39.56 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power Dellsome Power +1 more AL4
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
21.31 MW
Loading map...
Showing 25 locations