Storage (Duration 4h)
81 unique locations (345 components) - Page 1 of 4
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
adjacent to Kilmarnock South Substation KA1 3TN (12 components)
Lithium ion battery storage plant (2)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)
Lithium ion battery storage plant.
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (1 component)
New Build Battery Storage
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (1 component)
New Build Battery Storage
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)
A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (3)
Coal Aston, Dronfield, S18 3AA (2 components)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
Dounreay, Thurso KW14 7RE (2 components)
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)
12 MW Connection 48 MWh Distribution unit (2)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
Eccles Birgham Farm TD12 4LU (9 components)
Eccles Birgham Farm, TD12 4LU (2 components)
Eccles Birgham Farm, TD12 4LU. (1 component)
Lithium ion battery storage plant.
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (1 component)
New Build Storage Facility
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
Heysham Road, Bootle, L30 6TU (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)
BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …