Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

73 unique locations (302 components) - Page 2 of 3

Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.16 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (7 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Inactive •
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1), 2028-29 (T-4)
0.14 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (3 components)

New Build storage facility

Active • 2028-29 (T-4)
58.44 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1), 2028-29 (T-4)
0.59 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
39.57 MW
Loading map...
Showing 25 locations