Storage (Duration 1.5h)

16 unique locations (117 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2.01 MW
Potman's Lane, Battle, TN33 9BL (11 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 Limited New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-4) ...
14.67 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.78 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (7 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HEIT LR LIMITED New Build Generating CMU LR22 LR22 +3 more KY5
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.43 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.93 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.80 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.35 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (8 components)
• A battery energy storage system
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BD LIMITED New Build Generating CMU BROADDITCH BROADDITCH +3 more DA13
Active • 2029-30 (T-4), 2025-26 (T-4) ...
9.44 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
29.21 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
Loading map...
Showing 16 locations