Storage (Duration 1.5h)

110 unique locations (348 components) - Page 1 of 5

Active MW: 3210.97 MW
Inactive MW: 111.51 MW
Worset Lane Hartlepool TS27 3BL (1 component) Geocoding Needed

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active β€’ 2025-26 (T-4)
11.10 MW
Welkin Road, Bredbury, SK6 2BH (6 components) Geocoding Needed
β€’ A gas fuelled generating station.
β€’ Battery Energy Storage System
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
35.07 MW
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components) Geocoding Needed

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Welbeck Storage Welbeck Storage Not Prequalified WF6
Active β€’ 2025-26 (T-4)
2.25 MW
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components) Geocoding Needed
β€’ 247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
β€’ 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
Storage (Duration 1.5h) CARLTON ENERGY NO: 1 LIMITED CARLTON ENERGY NO: 2 LIMITED CARLTON ENERGY NO: 4 LIMITED +1 more New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 2 +2 more M31
Active β€’ 2027-28 (T-4)
114.05 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components) Geocoding Needed
β€’ 3 x 2MW gas gen sets
β€’ Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
10.03 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components) Geocoding Needed
β€’ A Battery Energy Storage System
β€’ A gas fuelled generating station
Active β€’ 2025-26 (T-4), 2024-25 (T-1)
26.37 MW
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS (1 component) Geocoding Needed

Battery storage station

Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Balbougie Storage KY11
Active β€’ 2027-28 (T-4)
4.84 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components) Geocoding Needed
β€’ A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
β€’ A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active β€’ 2026-27 (T-4), 2024-25 (T-4) ...
6.72 MW
Scottswood Road, Newcastle Upon Tyne, NE15 8SF (1 component) Geocoding Needed

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU Newburn Not Prequalified NE15
Active β€’ 2027-28 (T-4)
5.75 MW
RYE COMMON LANE BATTERY, BLUE BELL LODGE, RYE COMMON LANE, CRONDALL, FARNHAM, SURREY, GU10 5DE (1 component) Geocoding Needed

New Build 99 MW Battery Energy Storage system

Storage (Duration 1.5h) HARMONY RC LIMITED New Build Generating CMU Rye Common 1 ESS GU10
Active β€’ 2026-27 (T-4)
17.59 MW
Rusholme Grange, Drax, YO8 8PW (3 components) Geocoding Needed
β€’ Lithium-ion Battery Energy Storage System
β€’ New build 35MW Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
31.37 MW
Rush Green Farm, London Road, Hitchin, SG4 7PQ (2 components) Geocoding Needed
β€’ The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of 50MVA.
β€’ The CMU component at Rush Green Motors is an energy storage system comprised of batteries with an import and export capacity of at least 42MVA.
Storage (Duration 1.5h) RG STEVENAGE BESS LTD New Build Generating CMU RGS001 SG4
Active β€’ 2026-27 (T-4), 2025-26 (T-4)
22.43 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components) Geocoding Needed

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
35.11 MW
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components) Geocoding Needed

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Rotherham Storage Rotherham Storage Not Prequalified S61
Active β€’ 2025-26 (T-4)
7.49 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England, CT13 9NL (1 component) Geocoding Needed

New Build Battery Energy Storage System

Active β€’ 2028-29 (T-4)
27.37 MW
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL (6 components) Geocoding Needed
β€’ 35.000MW battery energy storage system
β€’ 35.000MW battery energy storage system.
β€’ Battery Energy Storage
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
33.08 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
β€’ Battery Storage Station
β€’ Gas reciprocating engines as the generating unit.
β€’ Open cycle gas turbine as the generating unit.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Potman's Lane, Battle, TN33 9BL (5 components) Geocoding Needed
β€’ A Battery Energy Storage System
β€’ A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 Limited New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
51.48 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components) Geocoding Needed
β€’ A New Build battery energy storage system.
β€’ An existing battery energy storage system.
β€’ The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active β€’ 2026-27 (T-4), 2025-26 (T-1) ...
111.74 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield, S13 9LU (1 component) Geocoding Needed

New build battery storage facility.

Active β€’ 2026-27 (T-4)
7.11 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Storage (Duration 1.5h) DBS 1 LIMITED New Build Generating CMU Dorehouse Not Prequalified S13
Active β€’ 2026-27 (T-4)
7.11 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components) Geocoding Needed
β€’ This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
β€’ This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active β€’ 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components) Geocoding Needed
β€’ A 40MW New Build Battery Storage site
β€’ A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
39.72 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active β€’ 2026-27 (T-4)
79.82 MW
Netherlands Way, Stallingborough, DN41 8DF (2 components) Geocoding Needed

New build battery storage facility

Storage (Duration 1.5h) ECOSTOR 1 IMMINGHAM LTD New Build Generating CMU ECOSTA DN41
Active β€’ 2026-27 (T-4)
14.22 MW
Loading map...
Showing 25 locations