OCGT and Reciprocating Engines

11 unique locations (197 components)

Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (5 components)
• Gas generation peaking plant comprising of 9 x 2MW engines
• Two hour duration battery storage
Active • 2028-29 (T-4), 2025-26 (T-1) ...
41.75 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (8 components)
• Existing CMU comprising of battery storage and associated plant
• Gas reciprocating engines.
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
34.25 MW
Radstone Rd, Radstone, Brackley NN13 5PY (7 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
Active • 2025-26 (T-1), 2021-22 (T-4) ...
4.68 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.28 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Knowsley Industrial Estate, Acornfield Rd, Liverpool, L33 7YX, United Kingdom (23 components)
• Energy facility comprising of reciprocating engine sets.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Unproven DSR Component
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.99 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
• A Battery Energy Storage System.
• Combined Heat and Power Plant Olympic Park London
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (67 components)
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1001.79 MW
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (7 components)
• 9-turbine wind farm located in Scotland with the installed capacity of 37.800MW
• New build gas generator
Active • 2028-29 (T-4), 2026-27 (T-4) ...
16.72 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (29 components)
• 1 x OCGT
• Commercial printers
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
577.46 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (5 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.70 MW
Loading map...
Showing 11 locations