126 unique locations (714 components) - Page 1 of 6

Wytch Farm, Wareham BH20 5JR (6 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Woolaston Road, Park Farm, Redditch, B98 7SG (2 components)

gas reciprocating engines.

Inactive • 2021-22 (T-4)
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (5 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
• An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist of the delivery of waste to the Facility by truck, where it will be deposited in a storage bunker, from which it will be fed into one or two (to be determined) thermal units (or "streams"). Each stream will consist of a moving grate, boiler and air pollution control equipment. The steam generated will drive a turbine for the generation of electricity.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Willow Farm Doncaster Road Tadcaster LS24 9PA (3 components)
• Energy facility comprising of reciprocating engine sets.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (2 components)
• A 4.8MW Battery Energy Storage System.
• A New Build 8MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
Whaley Rd, Barugh Green, Barnsley S75 1HS, UK (3 components)

one 1.2MW caterpillar generator

Inactive • 2021-22 (T-4), 2018-19 (T-1)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Gas engines in a peaking plant environment
Inactive • 2022-23 (T-3), 2021-22 (T-4)
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (40 components)
• The CMU component at Castelbridge is an energy storage system comprised of batteries and will have an import and export capacity of 5MW.
• This power plant is a series of modular integrated energy storage rack with batteries which serve as easily configurable building blocks. These racks are organized into individually managed GBS Zone subsystems which are able to be installed in standard ISO containers or in customized enclosures. There is an integrated control architecture with local user interface per battery zone, Integrated air conditioning units, fire detection and suppression system and an auxillary power distribution panel. There is an embedded DC isolation switch (per zone) with safety interlock management system. There is extensive fusing and protections at multiple levels of the system.
• West Burton A Power Station CMU 4 WA4-17= 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1598.80 MW
Waterswallows Road, Buxton, Derbyshire, SK17 7JB (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
Waterswallows Road Buxton Derbyshire SK17 7JB (21 components)
• 2.115MW Diesel and/or dual fuel reciprocating engine
• 2.115mw diesel and/or gas dual fuel reciprocating engine
• 2.116MW Diesel and / or gas dual fuel reciprocating engine
Inactive • 2018-19 (T-1)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
• Battery Storage Facility
• Energy facility comprising of reciprocating engine sets
Inactive • 2021-22 (T-4)
Visitors Car Park, Alexandra Park, Alexandra Drive, St Helens, WA10 3TP (2 components)
• DSR Component providing load turn down at a retail store
• New build power station comprised of multiple reciprocating engines
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Vicarage Lane, Off Church Lane Newton With Scale, Preston PR4 3RX (2 components)
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
• A gas or diesel fired grid support generating plant.
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Vacant land off Old Ively Road, Cody Technology Park, Ively Road, Farnborough, Hampshire, GU14 0LP (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4)
Vacant Land off Lytham Rd, Ipswich IP3 9BF (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Vacant Land off Haverton Hill Rd, Stockton-on-Tees, Billingham TS23 1PS. (1 component)

20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Vacant Land off Grimsbury Green Road, Banbury OX16 3WA, UK (1 component)

12 MW power plant comprising 6 x 2MW gas reciprocating engines. The Power plant is connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Units 13 &14 Ashmount Business Park Upper Fforest Way Swansea SA6 8QR (1 component)

14 MW power plant comprising 7 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.

Inactive • 2021-22 (T-4)
Unit 4, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)
Unit 2c (N), North Road, Marchwood Industrial Park, Marchwood SO40 4BL (8 components)
• Import/Export metering with diesel generation at a retail store
• The CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. The CMU is metered at the distribution boundary using a COP2 meter. There is no auxilliary load on site.
• This CMU consists of renewable diesel powered gensets within a building on a portside industrial estate. It uses a COP2 meter at the distribution boundary and has no auxilliary load or additional generation on site.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit 27A Orgreave Drive Dorehouse Ind. Estate Sheffield S13 9NR (3 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
The Power House Commercial Road Wolverhampton WV1 3QS (4 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
The Power House 38 Haughton Road Darlington DL1 1ST (22 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stainburn Road, Great Clifton, Derwent Valley, CA14 1TG (1 component)

New build power station comprised of multiple reciprocating engines

Inactive • 2021-22 (T-4)