DSR (Demand Side Response)

42 unique locations (588 components) - Page 1 of 2

WATERSIDE BELMONT 10 WATERSIDE, BELMONT, BOLTON, LANCASHIRE, BL7 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
52.13 MW
Unit 4 01-May Davygate North Yorkshire Great Britain YO1 8QR (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 14 10 Paternoster Square Great Britain EC4M 7DX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 1 11 Dalgety Drive Renfrewshire Great Britain PA7 5LN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Salendine Shopping Centre 144 Moor Hill Road Salendine Nook West Yorkshire Great Britain HD3 3XA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Moray Park Meadowbank Retail Park Marrionville Rd Great Britain EH7 5TF (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 263 Banbury Road Summertown Oxfordshire Great Britain OX2 7HN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
120.35 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (13 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
37.36 MW
Sainsburys Tower B 11 Mitchigan Avenue Salford Quays Greater Manchester Great Britain M50 2HA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Princess Way, Burnley, BB12 0EQ (16 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (12 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
26.63 MW
PL14 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
85.24 MW
Norbord Morayhill Dalcross Inverness IV2 7JQ (7 components)

4MW of demand reduction

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (9 components)
• 3.600MW of demand reduction
• 3.6MW of demand reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (9 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
16.58 MW
New Carrington Retail Centre Unit 10 New Mill Street Lancashire Great Britain PR7 5UP (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Low Hall 11 Walthamstow Avenue Chingford Great Britain E4 8ST (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (5 components)

1.500MW Demand reduction at Coventry Bus Depot

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Component has yet to be procured. (211 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.48 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (9 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (73 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
105.51 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (11 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
4.50 MW
Loading map...
Showing 25 locations