Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

181 unique locations (684 components) - Page 1 of 8

WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (6 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
WATERSIDE BELMONT 10 WATERSIDE, BELMONT, BOLTON, LANCASHIRE, BL7 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (1 component)

19 MW of demand reduction

Inactive • 2019-20 (T-1)
Unit 4 01-May Davygate North Yorkshire Great Britain YO1 8QR (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 14 10 Paternoster Square Great Britain EC4M 7DX (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 1 11 Dalgety Drive Renfrewshire Great Britain PA7 5LN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Salendine Shopping Centre 144 Moor Hill Road Salendine Nook West Yorkshire Great Britain HD3 3XA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 Moray Park Meadowbank Retail Park Marrionville Rd Great Britain EH7 5TF (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Unit 10 263 Banbury Road Summertown Oxfordshire Great Britain OX2 7HN (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (3 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (1 component)

5 MW of demand reduction

Inactive • 2019-20 (T-1)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)

2MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (1 component)

0.8MW demand reduction

Inactive • 2018-19 (T-1)
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (10 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations