Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

42 unique locations (233 components) - Page 1 of 2

Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
1.41 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
13.51 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.61 MW
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.65 MW
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (10 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.09 MW
Stroud Green Lane, Fareham, PO14 2HS (4 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
8.63 MW
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
20.79 MW
Poplars Solar Farm Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

1MW of demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.65 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (10 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.09 MW
Pierces Farm PV Palmers Lane Near Grazeley Burghfield Reading RG7 3AH (3 components)

0.25MW of demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.65 MW
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)
• 3.75 MW storage battery located in Devon
• 3.750 MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.74 MW
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (7 components)
• 0.261 MW of DSR
• 0.261 MW of demand reduction
• 0.261MW Storage Battery located in Devon
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
5.74 MW
Oxcroft Farm Stanfree Chesterfield Derbyshire S44 6AG (2 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.65 MW
Oaks Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
1.49 MW
Lucern Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
1.49 MW
Low Burntoft Farm Wolviston Billingham Durham TS22 5PD (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
Land North of Clayhill Farm Westoning MK45 5JD (5 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive • 2021-22 (T-4), 2018-19 (T-1)
7.61 MW
Kings Barn Energy Storage Kings Barn Farm Kings Barn Lane Steyning West Sussex BN44 3YR (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
8.63 MW
Hungerford Farm PV Hook Hampshire RG27 8SW (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
Hill Village Nadder Lane South Molton Devon EX36 4HP (10 components)
• 0.15MW of demand reduction
• 10 MW of demand reduction
DSR LIMEJUMP LTD Conditional EX36
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
9.72 MW
Hermitage Solar Farm Clayhill Farm Greenfield Road Westoning Bedford MK45 5JD (2 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
Haywood Grange PV Farm Heywood Grange Tickhill Lane Dilhorne Stoke-on-Trent ST10 2PL (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
0.96 MW
FIDEOAK MILL STOR, BISHOPS HULL, TAUNTON, SOMERSET, TA4 1AF (4 components)

26MW of Turn Down Capability

Inactive • 2021-22 (T-4), 2018-19 (T-1)
8.63 MW
Loading map...
Showing 25 locations