Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

3 unique locations (173 components)

Active MW: 844.26 MW
Inactive MW: 264.22 MW
Sites across Great Britain. See business plan. (41 components)

A combination of standby generation and load reduction.

Inactive • 2017-18 (TR), 2017-18 (T-1) ...
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
DSR GRIDBEYOND LIMITED Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
to be provided once CMU Components are known (87 components)

to be provided once CMU Components are known

Inactive • 2020-21 (T-4), 2017-18 (TR) ...
Loading map...
Showing 3 locations