Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GRIDBEYOND LIMITED

3 unique locations (177 components)

Active MW: 844.26 MW
Inactive MW: 264.22 MW
Sites across Great Britain. See business plan. (46 components)
• A combination of standby generation and load reduction.
• EV charging at residential premises
• Nantwich Existing Site CHP
Inactive • 2023-24 (T-1), 2017-18 (TR) ...
TBD (40 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation.
• Load reduction upon instruction
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
to be provided once CMU Components are known (91 components)
• Aggregated Generation - Diesel
• The CMU component is an aggregation of turn-down and onsite generation
• to be provided once CMU Components are known
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 3 locations