CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

23 unique locations (237 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
2 Leeds City Office Park, Leeds, LS11 5BD (9 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (11 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Blackshaw Rd, London SW17 0QT (9 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (5 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (8 components)
• EnerG 1000 CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (14 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cookley Pumping Station, 8 Caunsall Road, Caunsell, Kidderminster, DY11 5YB (18 components)
• 1.280MW CHP
• Back up generation
• Onsite generation
Inactive • 2023-24 (T-1), 2019-20 (T-1) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas turbine generator
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (7 components)
• 1 x hydro turbine & synchronous generator
• 20 MW of DSR
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (9 components)
• Gas fired CHP unit
• Hungry Snout Water Pumping Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)
• On-site existing CHP generating unit
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 23 locations