Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

6 unique locations (57 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
2 Leeds City Office Park, Leeds, LS11 5BD (9 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (8 components)
• EnerG 1000 CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Cookley Pumping Station, 8 Caunsall Road, Caunsell, Kidderminster, DY11 5YB (18 components)
• 1.280MW CHP
• Back up generation
• Onsite generation
Inactive • 2023-24 (T-1), 2019-20 (T-1) ...
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (7 components)
• 1 x hydro turbine & synchronous generator
• 20 MW of DSR
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (9 components)
• Gas fired CHP unit
• Hungry Snout Water Pumping Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 6 locations