CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

18 unique locations (200 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Ainsworth Lane, Knowsley, Prescot, Mereyside, L34 9EU (11 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Blackshaw Rd, London SW17 0QT (9 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (5 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
CAULDON LOW QUARRY, CAULDON, STOKE ON TRENT, STAFFORDSHIRE, ST10 3EW (8 components)
• EnerG 1000 CHP
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (14 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (16 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cookley Pumping Station, 8 Caunsall Road, Caunsell, Kidderminster, DY11 5YB (18 components)
• 1.280MW CHP
• Back up generation
• Onsite generation
Inactive • 2023-24 (T-1), 2019-20 (T-1) ...
Edgabaston, Birmingham, West Midlands, B15 2TT (40 components)
• Gas Engine
• Gas Turbine Generator
• Gas turbine generator
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Maxi Readymix Concrete, Enderby Road,Industrial Estate, Whetstone, Leicester LE8 6HZ (5 components)
• New build power station comprised of multiple reciprocating engines.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (4 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (9 components)
• Gas fired CHP unit
• Hungry Snout Water Pumping Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)
• On-site existing CHP generating unit
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 18 locations