Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

13 unique locations (77 components)

Active MW: 17924.36 MW
Inactive MW: 0.00 MW
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2027-28 (T-4)
5.68 MW
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph PL12
Active • 2027-28 (T-4)
6.50 MW
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
16.32 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.32 MW
Land on the north side of Hickling Lane, Dunston, Norwich, NR14 8PW (4 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note this is a multi-unit site, comprising a battery (PPNY25) and a solar unit (BLOG25). When commissioned, both units will be metered separately and have individual BMU IDs. The connection capacities for the battery and the solar units have been defined to comply with rule 3.5.1A and to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-1)
43.86 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP Pivot Power Bredbury Pivot Power Bredbury +2 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.48 MW
39.48 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2027-28 (T-4), 2026-27 (T-4) ...
47.33 MW
47.33 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity".
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.55 MW
Loading map...
Showing 13 locations