Storage (Duration 4h)

78 unique locations (354 components) - Page 1 of 4

adjacent to Kilmarnock South Substation KA1 3TN (10 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Lithium ion battery storage plant
• To be confirmed once components are known
Active • 2026-27 (T-4), 2025-26 (T-1) ...
107.51 MW
adjacent to National Grid Stalybridge substation SK15 3DA (1 component)

75MW battery storage located near to the National Grid Stalybridge substation.

Active • 2027-28 (T-4)
23.09 MW
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW
Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
122.81 MW
15.03 MW
7.51 MW
Centrica Langage Power Station, Holland Road, Plymouth, PL7 5AW. (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Centrica Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2024-25 (T-1), 2020-21 (T-4) ...
158.65 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (4 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.69 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (6 components)
• A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Active • 2027-28 (T-4), 2023-24 (T-1) ...
49.54 MW
Coal Aston, Dronfield, S18 3AA (3 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.57 MW
Dounreay, Thurso KW14 7RE (3 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.43 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (3 components)

12 MW Connection 48 MWh Distribution unit

Active • 2026-27 (T-4), 2023-24 (T-1)
20.46 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Eccles Birgham Farm, TD12 4LU (1 component)

Lithium ion battery storage plant

Active • 2027-28 (T-4)
15.39 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
33.39 MW
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2021-22 (T-4)
2.58 MW
Heysham Road, Bootle, L30 6TU (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Loading map...
Showing 25 locations