Storage (Duration 4h)

43 unique locations (199 components) - Page 1 of 2

Beach Esplanade, Aberdeen AB24 5NR (12 components)
• Battery Storage Plant
• CMU consisting of multiple reciprocating engines and alternators
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
4.36 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
15.03 MW
7.51 MW
Coal Aston, Dronfield, S18 3AA (3 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Dounreay, Thurso KW14 7RE (3 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
28.43 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
33.39 MW
Heysham Road, Bootle, L30 6TU (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
208.70 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.14 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
Active • 2028-29 (T-4), 2023-24 (T-4)
41.84 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (4 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage).
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.59 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Loading map...
Showing 25 locations