Storage (Duration 4h)

6 unique locations (37 components)

Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (11 components)
• Energy facility comprising of reciprocating engine sets.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Active • 2028-29 (T-4), 2020-21 (T-4)
584.36 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• New build power station comprised of multiple reciprocating engines.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
4.48 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (4 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage).
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Active • 2028-29 (T-4), 2024-25 (T-1) ...
0.59 MW
land adjacent to the AYRSHIRE GRID 400 KV SUBSTATION, Cambelton Farm, Beech Avenue, Hunterston, West Kilbride, KA23 9QF. (5 components)
• Lithium ion battery storage plant
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• Two 1.2MW caterpillar generators
Active • 2026-27 (T-4), 2021-22 (T-4) ...
22.93 MW
Centrica Langage Power Station, Holland Road, Plymouth, PL7 5AW. (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Centrica Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2024-25 (T-1), 2020-21 (T-4) ...
158.65 MW
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (9 components)
• 24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site.
• Load reduction on site supported by non-exporting standby generation.
• Load shedding
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...