Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

479 unique locations (1769 components) - Page 1 of 20

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26, 2024-25 ...
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley B30
Active • 2028-29
4.19 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26, 2024-25 ...
22.86 MW
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) CHECKERS ENERGY LIMITED New Build Generating CMU Checkers G51
Active • 2028-29 (T-4)
10.47 MW
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) JORDANTHORPE POWER LTD New Build Generating CMU Bochum Not Prequalified S8
Active • 2027-28 (T-4)
3.08 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.65 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Storage (Duration 2h) VOLTARIA BES 101 LTD New Build Generating CMU Hockley B19
Active • 2028-29 (T-4)
8.90 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
Storage (Duration 2h) Storage (Duration 4h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Stockport BESS Stockport BESS Not Prequalified SK8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
32.75 MW
Aikengall 2a Wind Farm, Innerwick, EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4), 2024-25 (T-1)
18.03 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Ardencaple Rejected G84
Active • 2028-29 (T-4)
10.47 MW
Arran View, Jameston Farm, Dalry, North Ayrshire, KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
Ash Lane, Bramley, Little London, Basingstoke and Deane, Hampshire, RG26 5FL, United Kingdom (1 component)

New build 49.995MW / 99.990MWh battery energy storage system.

Active • 2027-28 (T-4)
4.62 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Fawley Not Prequalified SO45
Active • 2027-28 (T-4)
11.08 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.20 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (2 components)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4), 2026-27 (T-1)
18.20 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 Not Prequalified CM11
Active • 2026-27 (T-4)
11.67 MW
Loading map...
Showing 25 locations