Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

113 unique locations (504 components) - Page 5 of 5

St Owens Cross, Peterstow, Hereford, HR9 6AU (2 components)

A lithium-ion Energy Storage Plant

Not Prequalified HR9
Inactive •
14.36 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

BS2
Inactive •
3.48 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

SG4
Inactive •
6.28 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (3 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Not Prequalified NG34
Inactive •
12.56 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
CR3
Inactive •
15.04 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Inactive •
10.79 MW
Todrig Farm Coldstream TD12 4JA (7 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Inactive •
71.20 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Inactive •
23.96 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (2 components)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Inactive •
40.20 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Rejected DL14
Inactive •
62.68 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Not Prequalified WF3
Inactive •
20.90 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (3 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

DL7
Inactive •
7.54 MW
Wright Street, Paisley, Renfrew, PA4 8AN (3 components)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Rejected PA4
Inactive •
20.94 MW
Loading map...
Showing 13 locations