Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

113 unique locations (504 components) - Page 2 of 5

Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 component)

2 hour Battery Energy Storage System

DD8
Inactive •
4.36 MW
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (3 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified OL16
Inactive •
13.54 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (2 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified SN12
Inactive •
8.16 MW
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (3 components)

New Build CMU comprising of battery storage and associated plant

TA4
Inactive •
24.18 MW
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

ST6
Inactive •
10.45 MW
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (5 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified ST9
Inactive •
70.04 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (6 components)
• New Build Battery Storage
• New build battery storage
Inactive •
167.25 MW
Land At Bishops Bowl Fishery Stratford-upon-Avon CV47 2SR (11 components)

Battery energy storage unit

Inactive •
12.36 MW
Land at Brook Farm, 90 High Street, Loscoe, DE75 7LJ (7 components)

Battery energy storage unit

Not Prequalified DE75
Inactive •
8.37 MW
Land at Duddingston, Newton, West Lothian, EH30 9SN (3 components)

20MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Inactive •
8.38 MW
Land at Hydes Lane, Hinckley, LE10 3DP (2 components)
• A Distribution Connected Battery Energy Storage System
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Inactive •
16.07 MW
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

Not Prequalified KA1
Inactive •
8.80 MW
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)

Battery energy storage unit

S4
Inactive •
21.52 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (9 components)

Battery energy storage unit

Not Prequalified S73
Inactive •
7.13 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant

Inactive •
22.70 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (10 components)

Battery energy storage unit

NG4
Inactive •
2.68 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (27 components)
• Battery energy storage unit
• Battery storage unit
Not Prequalified YO8
Inactive •
33.14 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (3 components)

CMU 24KEI4 is a battery storage CMU.

Inactive •
14.46 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Inactive •
35.18 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant

Not Prequalified NG24
Inactive •
8.16 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (5 components)

New Build Battery Energy Storage system

Rejected WF11
Inactive •
30.99 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Not Prequalified B61
Inactive •
4.67 MW
LAND LYING TO THE WEST OF STEPHENSON ROAD, WILSDEN, BRADFORD, BD15 0BZ (2 components)

New Build Battery Storage

Inactive •
20.94 MW
Land near School Lane, Sittingbourne, ME9 8QG (1 component)

Battery Storage

ME9
Inactive •
8.14 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

GL2
Inactive •
7.54 MW
Loading map...
Showing 25 locations