Storage (Duration 2h)

98 unique locations (810 components) - Page 1 of 4

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Withy Place Not Prequalified RG7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.46 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (6 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Whaddon Farm BESS Whaddon Farm Solar Park BA14
Active • 2029-30 (T-4), 2027-28 (T-4) ...
7.89 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (5 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
34.27 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (6 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (2 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 3 LIMITED New Build Generating CMU Not Prequalified NG34
Active • 2029-30 (T-4), 2028-29 (T-4)
17.22 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (2 components)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 4 LIMITED New Build Generating CMU SG4
Active • 2029-30 (T-4), 2028-29 (T-4)
9.36 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips BS2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4.29 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips St Philips BS2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2.83 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (2 components)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Staythorpe BESS Not Prequalified NG23
Active • 2029-30 (T-4), 2027-28 (T-4)
132.07 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (4 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.81 MW
South West side of the A444, Castle Gresley, DE11 9ES (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2029-30 (T-4), 2026-27 (T-4)
5.91 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (3 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Bolton A Not Prequalified BL5
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.33 MW
Site at Raiths Industrial Estate, Kirkton Drive, Dice, Aberdeen, AB21 0BG (2 components)

New build battery storage

Storage (Duration 2h) DYCE BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified AB21
Active • 2029-30 (T-4), 2028-29 (T-4)
21.42 MW
"Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom" (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
153.09 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Brigg Battery 2 hour duration
• Brigg Battery 2 hour duration. Lower Connection Capacity takes in to account degradation of capacity in year 6 of operation.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
30.29 MW
RYE COMMON LANE, BLUE BELL LODGE, RYE COMMON LANE, CRONDALL, FARNHAM, SURREY, GU10 5DE . (3 components)
• New Build 2-hour Battery Storage site
• New Build Battery Storage Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
50.49 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (23 components)
• Battery Storage Unit
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3497.57 MW
136.34 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2029-30 (T-4), 2028-29 (T-4) ...
21.18 MW
Old Bush Inn PH, Hinksford Lane, Swindon, Wall Heath, South Staffordshire, Staffordshire, West Midlands Combined Authority, England, DY6 0BA (2 components)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 21 LTD New Build Generating CMU Mile Flat Not Prequalified DY6
Active • 2029-30 (T-4), 2028-29 (T-4)
21.25 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (2 components)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) Balance Energy 5 Ltd New Build Generating CMU Radwell Not Prequalified SG7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.25 MW
Loading map...
Showing 25 locations