Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

59 unique locations (295 components) - Page 1 of 3

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.20 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (2 components)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4), 2026-27 (T-1)
18.20 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.96 MW
Birch Road, Colchester CO2 0EJ (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2026-27 (T-1) ...
16.81 MW
Church Road, Chelmsford, CM2 8UN (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Sandon Brook BESS CM2
Active • 2027-28 (T-4), 2026-27 (T-1)
12.61 MW
Eccles Birgham Farm TD12 4LU (13 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
280.35 MW
Eccles Birgham Farm, TD12 4LU (16 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 1 Kilmarnock South unit 2 TD12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
326.52 MW
Eccles Birgham Farm, TD12 4LU. (16 components)

Lithium ion battery storage plant.

Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Kilmarnock South unit 3 TD12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
326.52 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (4 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE FERRYBRIDGE BATTERY LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Ferrybridge BESS Ferrybridge BESS +1 more WF11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
126.78 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (4 components)
• New Build Battery Storage
• New build battery Storage
Active • 2029-30 (T-4), 2028-29 (T-4) ...
39.12 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (4 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5-hour BESS site
Active • 2027-28 (T-4), 2026-27 (T-1) ...
27.76 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2026-27 (T-4), 2026-27 (T-1) ...
3.55 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Kimpton BESS Kimpton BESS SP11
Active • 2027-28 (T-4), 2026-27 (T-1) ...
5.80 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road, Perth PH1 1QE (3 components)
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
• 49.9 MW standalone battery energy storage project.
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.05 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (4 components)
• New Build Battery Storage
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 4 LIMITED New Build Generating CMU COALB1 COALB1 +1 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
333.77 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, South Gloucestershire, BS37 9TX (5 components)
• A 25MW Battery Energy Storage System.
• A 47.5MW Battery Energy Storage System.
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 2.5h) HD000ACT LTD New Build Generating CMU Fairholme Minety BS37
Active • 2029-30 (T-4), 2027-28 (T-4) ...
37.53 MW
land at Keelings Road, Southminster, CM0 7JF (6 components)
• New build generating CMU component known as Dengie BESS
• New build generating CMU component known as Dengie Solar Park
Solar Photovoltaic Storage (Duration 2h) BRITISH SOLAR RENEWABLES LIMITED New Build Generating CMU Dengie BESS Dengie Solar Park Not Prequalified CM0
Active • 2029-30 (T-4), 2027-28 (T-4) ...
5.55 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (4 components)
• A 57.000MW Battery Energy Storage System.
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 2.5h) HB333MIL LTD New Build Generating CMU Mill Hill Mill Hill +1 more NW7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
41.68 MW
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (3 components)

Lithium-based battery energy storage system.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
32.25 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (13 components)

Battery Storage Plant (2)

Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1089.05 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (13 components)
• Battery Storage Plant
• Battery Storage plant
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1089.05 MW
Loading map...
Showing 25 locations