35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.65 MW
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.74 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (4 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2026-27 (T-1) ...
12.96 MW
Birch Road, Colchester CO2 0EJ (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2026-27 (T-1) ...
16.81 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.11 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System.

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 1 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 2 HP27
Active • 2025-26 (T-1)
12.73 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility

Active • 2026-27 (T-4), 2025-26 (T-1) ...
39.88 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system

Storage (Duration 2h) MANNINGTON ENERGY CENTRE LIMITED New Build Generating CMU Rejected BH21
Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (4 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5-hour BESS site
Active • 2027-28 (T-4), 2026-27 (T-1) ...
27.76 MW
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 component)

A standalone 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected PO17
Active • 2025-26 (T-1)
0.26 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2027-28 (T-4), 2026-27 (T-1) ...
32.13 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (3 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Kimpton BESS Kimpton BESS SP11
Active • 2027-28 (T-4), 2026-27 (T-1) ...
5.80 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
69.01 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road, Perth PH1 1QE (3 components)
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
• 49.9 MW standalone battery energy storage project.
Active • 2027-28 (T-4), 2026-27 (T-1) ...
31.05 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW