Storage (Duration 2h)

35 unique locations (191 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Active • 2029-30, 2027-28 ...
488.49 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26, 2024-25 ...
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26, 2024-25 ...
22.86 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)
• 48MW Battery Energy Storage facility connected to 132kv network
• 49.5MW Battery Energy Storage facility connected to 132kv network
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility

Active • 2026-27 (T-4), 2025-26 (T-1) ...
39.88 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (1 component)

A new build 20MW battery energy storage system

Storage (Duration 2h) HARMONY FM LIMITED New Build Generating CMU Farnham ESS GU10
Inactive • 2023-24 (T-1)
7.40 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire, BD15 0BZ (3 components)

New build battery storage.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (4 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) 2 LIMITED New Build Generating CMU PILLSWOOD2 PILLSWOOD2 +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (3 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Reciprocating engines Storage (Duration 2h) KIRKBY BATTERY STORAGE LTD New Build Generating CMU KIRKBY Kirkby BESS L33
Active • 2027-28 (T-4), 2023-24 (T-4) ...
7.62 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (19 components)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
Reciprocating engines Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Fulwood Rd Fulwood Road - Battery +2 more NG17
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP (4 components)

This is a 20MW battery storage facility connected at 33kV.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Storage (Duration 2h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw +1 more ML2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.82 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
16.66 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components) Geocoding Needed

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Storage (Duration 2h) FRASERBURGH ENERGY LTD New Build Generating CMU Not Prequalified
Active • 2026-27 (T-4), 2023-24 (T-1)
13.31 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
16.66 MW
Land on the South Side of Fairy Lane, Sale, M33 2JU (7 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.41 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (12 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.74 MW
Mannington Depot, Mannington Depot Service Road Mannington, Swindon SN5 8BA (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) SW MANNINGTON LIMITED Mannington Mannington +1 more SN5
Active • 2024-25 (T-4), 2023-24 (T-1) ...
10.29 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Pleasance Road - Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (6 components)

Battery storage plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.21 MW
Loading map...
Showing 25 locations