Storage (Duration 1h)

2 unique locations (22 components)

Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)
• CMU consisting of a gas reciprocating engine and alternator
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (20 components)
• A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
7.30 MW
Loading map...
Showing 2 locations