Storage (Duration 1h)

1 unique locations (3 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (3 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active β€’ 2028-29 (T-4), 2026-27 (T-1) ...
2.83 MW