64 unique locations (368 components) - Page 1 of 3

Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components)
• Battery Storage Station
• Load reduction
Active • 2025-26 (T-4), 2022-23 (T-3)
1.35 MW
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
• 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2022-23 (T-3) ...
28.51 MW
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF (4 components)

Battery Energy Storage System

Inactive • 2021-22 (T-4), 2019-20 (T-1)
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (6 components)
• 3 x 2MW gas gen sets
• Battery Storage Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.19 MW
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH (1 component)

Battery Energy Storage System

Inactive • 2022-23 (T-4)
The Manorway, Stanford-leHope, SS17 9LL (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
5.49 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (19 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
7.42 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• A new build 20MW battery energy storage system
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
Active • 2025-26 (T-4)
19.67 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 component)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
27.37 MW
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL (1 component)

New Build Battery Energy Storage System

Active • 2028-29 (T-4)
27.37 MW
Potman's Lane, Battle, TN33 9BL (5 components)

A Battery Energy Storage System

Active • 2025-26 (T-4), 2023-24 (T-1)
51.79 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (7 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
• Component has yet to be procured.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
22.08 MW
Netherlands Way, Stallingborough, DN41 8DF (2 components)

New build battery storage facility

Active • 2026-27 (T-4)
14.22 MW
Minchens Lane Bramley RG7 2NL (2 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
15.56 MW
Minchens Lane Bramley RG7 2NL (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2027-28 (T-4)
6.57 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 49.5MW Battery Energy Storage facility
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
376.72 MW
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY (3 components)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2028-29 (T-4), 2027-28 (T-4)
24.54 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.25 MW
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
Active • 2028-29 (T-4), 2020-21 (T-4)
18.92 MW
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
7.32 MW
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (3 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

Active • 2027-28 (T-4), 2025-26 (T-1)
31.26 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build 99.9MW battery energy storage system
• A new build battery energy storage system
• Genset 2
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.46 MW
Loading map...
Showing 25 locations