Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1.5h)

9 unique locations (32 components)

17.59 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (8 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.72 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.02 MW
Land north of Butterfly Lane, land surrounding Hilfield Farm and land west of Hilfield Lane, Aldenham, near WD25 8DD (1 component)

A 57.000 MW / 85.500 MWh battery energy storage system

Active • 2027-28 (T-4)
6.57 MW
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2026-27 (T-4)
6.68 MW
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF. (4 components)
• 25MW Lithium-ion Energy Storage System
• 99.9MW Lithium-ion Energy Storage System
Active • 2027-28 (T-4)
1.27 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.62 MW
Loading map...
Showing 9 locations