Storage (Duration 1.5h)

3 unique locations (3 components)

17.59 MW
Plot A, Dorehouse Industrial Estate, Handsworth, Sheffield S13 9LU (1 component)

New build battery storage facility.

Active • 2026-27 (T-4)
7.11 MW
Land adjacent to Gately Moor Reservoir, Redmarshall, Stockton-on-Tees TS18 1LD (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 40.9 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2026-27 (T-4)
6.68 MW
Loading map...
Showing 3 locations