Storage (Duration 0.5h)

22 unique locations (69 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready …

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Arkwright Road New Build Generating CMU Arkwright Road New Build Generating CMU Conditional WA7
Inactive • 2022-23, 2021-22
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd Peak Gen Power 27 Peak Gen Power 27 +1 more Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Gateway Crescent New Build Generating CMU Gateway Crescent New Build Generating CMU Conditional OL9
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land Adjacent to Braintree Substation, Braintree 400kV substation, Braintree Road, Cressing, CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP Pivot Power Braintree Conditional CM77
Inactive • 2022-23 (T-4)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land at Jarrow Slake, Port of Tyne, Adjacent to Jarrow Road, South Shields, NE34 9PS (6 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) FS Port Of Tyne Limited Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land at Lookabootye, Broxburn, West Lothian, EH52 5PD (4 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) UK ENERGY STORAGE SERVICES LIMITED Broxburn Energy Storage Broxburn Energy Storage EH52
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components)

Battery Storage Plant

Storage Storage (Duration 0.5h) CREYKE BECK STORAGE LIMITED New Build Generating CMU Creyke Beck Storage 026 Creyke Beck Storage 052 HU16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land to the West of Harker Grid Sub Station, Low Harker, Harker, Carlisle, CA6 4DQ (1 component)

New build transmission connected battery storage site

Storage (Duration 0.5h) Pivot Power LLP Pivot Power Harker Conditional CA6
Inactive • 2022-23 (T-4)
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) HC ESS3 LIMITED Roundponds Storage 1 Roundponds Storage 1 +1 more SN12
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (1 component)

battery storage with other generation

Storage (Duration 0.5h) HC ESS2 LIMITED Existing Generating CMU ALPHA NG21
Inactive • 2019-20 (T-1)
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) PEAK GEN POWER 17 LIMITED Peak Gen Power 17 Peak Gen Power 17 Conditional OX28
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...