Storage (Duration 0.5h)

17 unique locations (38 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready …

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Arkwright Road New Build Generating CMU Arkwright Road New Build Generating CMU Conditional WA7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)
Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd Peak Gen Power 27 Peak Gen Power 27 +1 more Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Storage Storage (Duration 0.5h) ORSTED ESS MERSEY LIMITED New Build Generating CMU Carnegie Road New Build Generating CMU Carnegie Road New Build Generating CMU L13
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Gateway Crescent New Build Generating CMU Gateway Crescent New Build Generating CMU Conditional OL9
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 1h) Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Hawthorne Road Hawthorne Road New Build Generating CMU +1 more Conditional L20
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Land Adjacent to Braintree Substation, Braintree 400kV substation, Braintree Road, Cressing, CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP Pivot Power Braintree Conditional CM77
Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)
Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Norwich Conditional NR14
Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation, Mangreen Lane, Stoke Holy Cross, Norwich, NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
Land to the West of Harker Grid Sub Station, Low Harker, Harker, Carlisle, CA6 4DQ (1 component)

New build transmission connected battery storage site

Storage (Duration 0.5h) Pivot Power LLP Pivot Power Harker Conditional CA6
Inactive • 2022-23 (T-4)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)
Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) PEAK GEN POWER 17 LIMITED Peak Gen Power 17 Peak Gen Power 17 Conditional OX28
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 17 locations