Storage (Duration 0.5h)

18 unique locations (57 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
9.44 MW
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) Roundponds Energy Limited Existing Generating CMU Roundponds Storage 1 Roundponds Storage 1 SN12
Inactive • 2019-20 (T-1), 2018-19 (T-1)
67.43 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Battery Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (Nearest Postcode to grid reference: SG90JB) (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 0.5h) PELHAM STORAGE LIMITED Existing Generating CMU Pelham Storage 027 Pelham Storage 053 CM23
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components)

Battery Storage Plant

Storage Storage (Duration 0.5h) CREYKE BECK STORAGE LIMITED New Build Generating CMU Creyke Beck Storage 026 Creyke Beck Storage 052 HU16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
19.40 MW
Land at Lookabootye, Broxburn, West Lothian, EH52 5PD (4 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
6.90 MW
Land at Lookabootye Broxburn West Lothian EH52 5PD (3 components)
• Operational battery (2)
• New build battery
Storage Storage (Duration 0.5h) UK ENERGY STORAGE SERVICES LIMITED New Build Generating CMU Broxburn Energy Storage Broxburn Energy Storage EH52
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) SOUTH SHIELDS ENERGY STORAGE LTD Existing Generating CMU Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
55.99 MW
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.38 MW
Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 Conditional SL9
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
Loading map...
Showing 18 locations