Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 9h)

9 unique locations (34 components)

Active MW: 17924.36 MW
Inactive MW: 0.00 MW
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2027-28 (T-4)
5.68 MW
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph PL12
Active • 2027-28 (T-4)
6.50 MW
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components) Geocoding Needed
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.26 MW
Land on the north side of Hickling Lane, Dunston, Norwich, NR14 8PW (2 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4)
15.16 MW
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 9h) ASHGREEN ENERGYFARM LIMITED PIVOTED POWER LLP New Build Generating CMU Norwich Pivot Norwich Yare NR14
Active • 2027-28 (T-4)
15.16 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (4 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
43.43 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (4 components) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
48.66 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree Pivot Power Braintree +1 more CM77
Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (8 components) Geocoding Needed
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.12 MW
Loading map...
Showing 9 locations