Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 8h)

16 unique locations (206 components)

Active MW: 15887.74 MW
Inactive MW: 0.00 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (7 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
308.46 MW
Luton Road, Chalton, Fancott, Toddington, Central Bedfordshire, England, LU5 6HT (2 components)

Battery Storage Plant

Storage (Duration 5h) Storage (Duration 8h) SUNDON STORAGE LIMITED New Build Generating CMU Sundon Storage Limited Not Prequalified LU5
Active • 2029-30 (T-4), 2028-29 (T-4)
214.39 MW
Land to the north of Chickerell National Grid substation, directly south of Coldharbour, DT3 4BG (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 8h) CHICKERELL STORAGE LIMITED New Build Generating CMU Chickerell Storage Limited Not Prequalified DT3
Active • 2029-30 (T-4), 2027-28 (T-4)
149.33 MW
Land on the north west side of Holt Road, Mannington Heath, Wimborne, BH21 6SE (2 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is an electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. The connection capacity is lower than the TEC in the Connection Agreement to account for the battery degradation and ensure that the stated connection capacity can be maintained for the life of the agreement. This has been done in line with paragraphs 2.1.4 and 2.1.5 on page 3 of the NESO guidance document "Method of Calculation and Capacity". Please note that the Appendix C and grid documents refer to a battery and solar unit ("Power Station") connected at the same connection point. No applications will be submitted for the solar unit in the 2025 pre-qualification and it does not have a capacity market agreement from previous auctions. Therefore, the site is not a multi-unit site, in line with paragraph 2.1.1 on page 3 of the NESO guidance document "Multi-Unit Sites". Under rule 3.5.1A, the connection capacity used in future applications for the solar unit will be defined to ensure that the aggregate connection capacity does not exceed the total TEC stated in the Connection Agreement. The approach taken is in line with paragraph 3.2.8 on page 8 of the NESO guidance document "Connection Arrangement and Agreements".
Active • 2029-30 (T-4), 2028-29 (T-4)
14.51 MW
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 8h) EXETER STORAGE LIMITED New Build Generating CMU Exeter Storage Limited EX5
Active • 2029-30 (T-4), 2027-28 (T-4)
108.26 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (3 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) Storage (Duration 8h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
291.34 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (7 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
145.79 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) Storage (Duration 8h) PD688IRO LTD PD503HAN LTD New Build Generating CMU Minety 2 Southfields 1 +1 more SN16
Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (2 components)

A Battery Energy Storage System.

Reciprocating engines Storage (Duration 8h) HB411MIN LTD New Build Generating CMU Dogtrap Minety SN16
Active • 2028-29 (T-4), 2024-25 (T-4)
39.65 MW
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (1 component)

New build BESS to be installed within a future Greener Grid Park.

Storage (Duration 8h) STATKRAFT UK LTD New Build Generating CMU Not Prequalified KW14
Active • 2028-29 (T-4)
15.28 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Loading map...
Showing 16 locations