Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 6h)

6 unique locations (162 components)

Active MW: 15220.84 MW
Inactive MW: 0.00 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• The CRYOBattery? is the world?s first commercial-scale Cryogenic Energy Storage system. The technology uses surplus electricity to condense atmospheric air into a liquid. The CRYOBattery? has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
Storage (Duration 6h) CRYOBATTERY ONE LIMITED Cryobattery01 Cryobattery01 M31
Active • 2028-29 (T-4), 2025-26 (T-4)
31.27 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (2 components)
• 24.5 MW BESS
• 98 MW BESS
Storage (Duration 6h) Storage (Duration 1.5h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU Leatherhead Not Prequalified KT21
Active • 2029-30 (T-4), 2028-29 (T-4)
31.65 MW
Loading map...
Showing 6 locations