31 unique locations (126 components) - Page 1 of 2

Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Rejected DL14
Inactive •
62.68 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Inactive •
0.16 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Inactive •
0.27 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (3 components)

New Build Battery Storage Facility

Not Prequalified NP11
Inactive •
10.44 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
CR3
Inactive •
15.04 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (18 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

DN6
Inactive •
584.36 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (5 components)

BESS project to be installed within a future Greener Grid Park.

Inactive •
55.01 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified CO4
Inactive •
0.27 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified SS7
Inactive •
0.27 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (6 components)

BESS project to be installed within a future Greener Grid Park.

Not Prequalified PA2
Inactive •
729.20 MW
Selby, North Yorkshire, YO8 6PG (4 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
YO8
Inactive •
33.45 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (4 components)

New Build Battery Storage Facility

Not Prequalified YO8
Inactive •
50.09 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Rejected AB22
Inactive •
39.57 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified HR2
Inactive •
0.27 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified EX5
Inactive •
0.27 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

CT3
Inactive •
0.16 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified EX31
Inactive •
0.59 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (3 components)

New Build storage facility

Not Prequalified B62
Inactive •
58.44 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified RM15
Inactive •
0.26 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified TQ13
Inactive •
0.14 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified IP9
Inactive •
0.16 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified LN1
Inactive •
0.27 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

WV5
Inactive •
7.93 MW
Heysham Road, Bootle, L30 6TU (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Not Prequalified L30
Inactive •
0.27 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (3 components)

New Build Storage Facility

Not Prequalified WR9
Inactive •
33.39 MW