Storage (Duration 4h)

73 unique locations (256 components) - Page 2 of 3

Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site.

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (6 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2024-25 (T-1)
0.59 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.26 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2024-25 (T-1)
0.14 MW
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
208.70 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
28.01 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW
Land at Hammonds Drive, Eastbourne BN22 8QJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.22 MW
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1)
0.09 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Loading map...
Showing 25 locations