Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 DL14
Active • 2028-29 (T-4)
31.34 MW
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.26 MW
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 component)

New Build Battery Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR-Treowen Not Prequalified NP11
Active • 2028-29 (T-4)
5.22 MW
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Tillingdown Tillingdown 2 CR3
Active • 2028-29 (T-4)
7.52 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (15 components)
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
• New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
Storage (Duration 2h) Storage (Duration 4h) THORPE MARSH GREEN ENERGY HUB LIMITED Thorpe Marsh BESS 1 Thorpe Marsh BESS 1 (2024) +13 more DN6
Active • 2028-29 (T-4), 2027-28 (T-4)
799.82 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

Storage (Duration 4h) BALWEN LIMITED STATKRAFT UK LTD New Build Generating CMU THOR-2 YO42
Active • 2028-29 (T-4), 2025-26 (T-1)
88.23 MW
Station Rd, Clowne, Chesterfield S43 4AB (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Spring Lane Not Prequalified NG4
Active • 2029-30 (T-4), 2028-29 (T-4)
77.13 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2029-30 (T-4), 2028-29 (T-4) ...
0.31 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (7 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
308.46 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Greenacres Greenacres 2 YO8
Active • 2028-29 (T-4)
25.07 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (2 components)

New Build Battery Storage Facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Scalm Park Not Prequalified YO8
Active • 2029-30 (T-4), 2028-29 (T-4)
34.28 MW
Persley Croft, The Parkway, Aberdeen AB22 8AN (2 components)
• CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN
• The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; ? 1No. 33 kilovolt (Kv) operator substation (23m x 7.4m x 4.45m); ? 1No. 33Kv distribution network operator (DNO) substation to facilitate network connection (8.7m x 5.7m x 3.5m); ? Office accommodation and welfare facilities (12.2m x 2.4m x 2.59m)
Storage (Duration 4h) Storage (Duration 9h) PERSLEY CROFT BESS LTD New Build Generating CMU Persley Croft Not Prequalified AB22
Active • 2028-29 (T-4), 2027-28 (T-4)
28.88 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 4h) Storage (Duration 2.5h) BATTERY BOX LIMITED New Build Generating CMU Not Prequalified HR2
Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2026-27 (T-1) ...
0.25 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (7 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• 50MW battery storage located near Coalburn North 400kV substation.
• 50MW battery storage located near to the Coalburn North 400kV substation.
Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h) ZENOBE COALBURN LIMITED New Build Generating CMU Coalburn unit 1 Coalburn unit 2 ML11
Active • 2028-29 (T-4), 2027-28 (T-4)
145.79 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (2 components)

New Build storage facility

Storage (Duration 4h) GRENERGY RENEWABLES UK LIMITED New Build Generating CMU GR - Goodrest Farm Not Prequalified B62
Active • 2029-30 (T-4), 2028-29 (T-4)
59.99 MW
Land near School Lane, Sittingbourne, ME9 8QG (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
33.31 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Loading map...