Storage (Duration 4h)

8 unique locations (42 components)

Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Dragons Lane, Moston, Sandbach, CW11 3QH (3 components)

12 MW Connection 48 MWh Distribution unit

Active • 2026-27 (T-4), 2023-24 (T-1)
20.46 MW
adjacent to Kilmarnock South Substation KA1 3TN (8 components)

Lithium ion battery storage plant

Active • 2026-27 (T-4), 2025-26 (T-1)
107.51 MW
Loading map...
Showing 8 locations