Storage (Duration 2h)

50 unique locations (453 components) - Page 1 of 2

Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2023-24 (T-1), 2024-25 (T-1) ...
29.64 MW
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
29.30 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2022-23 (T-1), 2022-23 (T-3) ...
66.68 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2023-24 (T-1), 2025-26 (T-4)
13.65 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
23.96 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (4 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX].

Active • 2023-24 (T-1), 2026-27 (T-4)
13.44 MW
Smithyard Lane, Williton, TA4 4NN (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2023-24 (T-1), 2026-27 (T-4)
19.29 MW
Rusholme Grange, Drax, YO8 8PW (6 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Active • 2023-24 (T-1), 2024-25 (T-1)
59.76 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (11 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
33.26 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2023-24 (T-1), 2023-24 (T-4) ...
71.09 MW
36.31 MW
73.01 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2023-24 (T-1), 2026-27 (T-4)
9.02 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
21.03 MW
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (5 components)

A Battery Energy Storage System.

Inactive • 2022-23 (T-1), 2023-24 (T-1)
20.58 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (6 components)
• New build battery storage
• New build generating storage unit
Active • 2023-24 (T-1), 2028-29 (T-4)
66.79 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2023-24 (T-1), 2023-24 (T-4) ...
106.91 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (6 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 50MW New Build Battery Storage site
Active • 2022-23 (T-3), 2023-24 (T-1) ...
31.39 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (14 components)

Battery Storage Plant

Active • 2022-23 (T-1), 2023-24 (T-1) ...
68.11 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (8 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Active • 2022-23 (T-1), 2023-24 (T-1) ...
15.25 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2023-24 (T-1), 2024-25 (T-1) ...
12.40 MW
Loading map...
Showing 25 locations