Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

227 unique locations (962 components) - Page 1 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Yalberton Rejected TQ4
Active • 2025-26 (T-4)
Whitelee Windfarm Extension, East Ayrshire, KA16 9LE (1 component)

1 x 50MW Lithium-ion battery with duration of 1 hour

Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Extension Not Prequalified KA16
Active • 2026-27 (T-4)
5.91 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Storage Storage (Duration 1h) GHEB2 C6 LIMITED New Build Generating CMU Whitehouse Farm Whitehouse Farm +3 more WR13
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT05 BATT05 LE12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.98 MW
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW) (4 components)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of … (3)

Storage (Duration 1h) FS WEST GOURDIE LIMITED New Build Generating CMU FSWG23 DD2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.10 MW
Welkin Road, Portwood, Stockport, SK6 2BH (1 component)

Battery Energy Storage System

Storage (Duration 1h) AVE 002 LIMITED New Build Generating CMU Welkin Road Not Prequalified SK6
Active • 2025-26 (T-4)
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Welbeck Storage Welbeck Storage Not Prequalified WF6
Active • 2025-26 (T-4)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.10 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse. (3)

Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.79 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components)

Battery Storage Station (3)

Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.88 MW
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Storage (Duration 1h) FIELD OLDHAM LTD New Build Generating CMU Gateway Crescent OL9
Active • 2024-25 (T-4)
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Storage (Duration 1h) WP GRID STORAGE 1 LIMITED New Build Generating CMU WP BESS 1 Not Prequalified NP19
Active • 2025-26 (T-4)
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components)
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Active • 2025-26 (T-4), 2024-25 (T-1)
2.38 MW
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component)

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Storage (Duration 1h) TILN CONNECTIONS LTD New Build Generating CMU Tiln Storage Facility DN22
Active • 2025-26 (T-4)
Tickhill Road, Maltby, S66 7QR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Maltby Rejected S66
Active • 2025-26 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry S64
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) BRK 001 Limited New Build Generating CMU The Common The Common A +2 more Not Prequalified SN16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Loading map...
Showing 25 locations