Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

94 unique locations (304 components) - Page 2 of 4

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Milton Court Farm, Dorking, RH4 3LY (5 components) Geocoding Needed
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
9.17 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components) Geocoding Needed

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage Storage (Duration 1h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU LOWDY1 LOWDY1 Conditional CA11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.20 MW
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components) Geocoding Needed

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.

Storage (Duration 1h) ENERGY DEMAND & RESPONSE LIMITED New Build Generating CMU Leighton Hall BESS Not Prequalified CW1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.05 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component) Geocoding Needed

Frequency response 60 minute Battery Storage

Storage (Duration 1h) ADD RENEWABLES NO.3 LIMITED New Build Generating CMU Hunn1 Conditional S70
Inactive • 2022-23 (T-4)
10.29 MW
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components) Geocoding Needed

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2.73 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2020-21 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2021-22 (T-1)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components) Geocoding Needed

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.37 MW
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components) Geocoding Needed
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas) NORTH EAST GRID STORAGE TWO LTD New Build Generating CMU Bransholme Battery Storage Facility Bransholme Facility Conditional HU7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
24.84 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
24.42 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) GRIDRESERVE LTD New Build Generating CMU Byers Brae Battery Storage Facility Byers Brae Battery Storage Facility +1 more EH54
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components) Geocoding Needed
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Inactive • 2022-23 (T-4), 2019-20 (T-1)
6.68 MW
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Storage (Duration 1h) ENERGY STORE 4 LTD New Build Generating CMU Hull Energy Centre Conditional HU11
Inactive • 2019-20 (T-1)
Land south of Halesfield 13, Telford, TF7 4PL (2 components) Geocoding Needed

5MW of Lithium Ion battery storage and power conversion systems.

Storage (Duration 1h) HALESFIELD ENERGY CENTER LTD New Build Generating CMU Not Prequalified TF7
Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.05 MW
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components) Geocoding Needed

A 25MW New Build Battery Storage site

Storage (Duration 1h) Noriker Bond Ltd New Build Generating CMU Blandford 1 BH16
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components) Geocoding Needed

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Storage Storage (Duration 1h) SOUTH WEST GRID STORAGE TWO LTD New Build Generating CMU Iron Acton Battery Storage Facility Iron Acton Battery Storage Facility Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4)
23.60 MW
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN., See map uploaded. (4 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components) Geocoding Needed

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage Storage (Duration 1h) NORTH EAST GRID STORAGE ONE LTD New Build Generating CMU Saltend Battery Storage Facility Saltend Battery Storage Facility Conditional HU12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
13.17 MW
Land off Carseview Road, Forfar, DD8 3BS (7 components) Geocoding Needed
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
20.96 MW
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components) Geocoding Needed

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road

Storage (Duration 1h) PINSTONE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified SL9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.18 MW
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component) Geocoding Needed

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Storage (Duration 1h) Aura Power Storage Solutions Ltd New Build Generating CMU Feeder Road Battery Storage Facility Conditional BS2
Inactive • 2022-23 (T-4)
5.88 MW
Land at Traston Road, Newport NP19 4PW (1 component) Geocoding Needed

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) FPC INDUSTRY & ENTERPRISE 2 LIMITED New Build Generating CMU Traston Road Conditional NP19
Inactive • 2022-23 (T-4)
5.80 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components) Geocoding Needed
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Tollgate Battery Storage Facility Tollgate Battery Storage Facility +1 more Conditional AL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
44.12 MW
Loading map...
Showing 25 locations