Storage (Duration 1h)
94 unique locations (304 components) - Page 2 of 4
Milton Court Farm, Dorking, RH4 3LY (5 components) Geocoding Needed
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)
7 MW of Battery Storage located at Grantham. (3)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components) Geocoding Needed
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components) Geocoding Needed
10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component) Geocoding Needed
Frequency response 60 minute Battery Storage
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components) Geocoding Needed
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components) Geocoding Needed
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components) Geocoding Needed
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components) Geocoding Needed
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)
Land south of Westerton Road, Keith, Moray, Scotland, AB55 5NR (1 component) Geocoding Needed
Battery Storage
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components) Geocoding Needed
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Land south of Halesfield 13, Telford, TF7 4PL (2 components) Geocoding Needed
5MW of Lithium Ion battery storage and power conversion systems.
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components) Geocoding Needed
A 25MW New Build Battery Storage site
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components) Geocoding Needed
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN., See map uploaded. (4 components) Geocoding Needed
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components) Geocoding Needed
The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Land off Carseview Road, Forfar, DD8 3BS (7 components) Geocoding Needed
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components) Geocoding Needed
20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component) Geocoding Needed
The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Land at Traston Road, Newport NP19 4PW (1 component) Geocoding Needed
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …