Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

317 unique locations (1239 components) - Page 13 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Basing Road, Basingstoke, RG24 7AN (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Storage (Duration 1h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.14 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT01 BATT01 SA11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.32 MW
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 027 LIMITED ARL 027 LIMITED New Build Generating CMU Back Lane Back Lane +2 more S44
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.72 MW
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR (1 component)

The CMU component will have a connection capacity of 2.52MW. BYD Battery

Active • 2027-28 (T-4)
0.20 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Battery Whitelee Battery +1 more G75
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Storage (Duration 1h) KIWI POWER LTD New Build Generating CMU Rejected L38
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Storage (Duration 1h) HC ESS2 LIMITED New Build Generating CMU Littlebrook C Littlebrook C Not Prequalified DA1
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Airdrie WWTW, Sheepford, Cambroe, North Lanarkshire, ML5 4PZ (1 component)

45MW/45MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU AIRDRIE Not Prequalified ML5
Active • 2026-27 (T-4)
5.32 MW
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (7 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (3)

Storage (Duration 1h) Storage (Duration 1.5h) FEEDER GRID STORAGE LIMITED New Build Generating CMU Feeder Road Feeder Road +2 more BS2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.35 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.86 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Storage Storage (Duration 1h) GHEB2 A1 Limited New Build Generating CMU Pikelaw Place Pikelaw Place +2 more Not Prequalified WN8
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Not Prequalified B98
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 17 locations